A newly built commercial interior mid-fit-out with a ladder, casework, and protective floor covering

Commercial Post-Construction Cleaning.

Final cleanup after builds and renovations — dust removal, fixture detailing, and move-in-ready handovers. Serving Hamilton, Burlington, Oakville, and Mississauga.

What We Do

What is post-construction?

Post-construction cleaning isn’t ordinary housekeeping — it’s a meticulous process designed to remove dust, debris, and residue left after building, renovation, or demolition. Whether it’s new builds, renovation projects, development sites, or commercial fit-ups, our trained crews deliver the precision and attention to detail your finished project deserves. From floors and fixtures to windows and surfaces, we ensure your space is clean, safe, and ready for occupancy.

Post-Construction Cleaning in Hamilton
What We Cover

The work, in detail.

Routine and detail, both included. One crew, one schedule, one standard — held to it every visit.

Dust & Debris Removal

Eliminate drywall dust, sanding residue, and leftover construction debris.

Surface & Detail Cleaning

Thorough wipe-down of walls, baseboards, doors, trim, and fixtures.

Floor Care & Debris Clearing

Sweeping, mopping, and vacuuming of all flooring types to restore shine.

Window & Glass Cleaning

Removal of stickers, smudges, and dust from interior glass and frames.

Kitchen & Bathroom Finish Cleaning

Deep cleaning of cabinets, countertops, sinks, toilets, and tile surfaces.

High-Touchpoint Sanitization

Disinfection of handles, switches, rails, and commonly used surfaces.

Industries We Serve

Trusted across key sectors.

Different buildings, different protocols. Every crew is trained for the one in front of them.

01

New Builds & Multi-Unit Projects

Final cleanup for new builds and multi-unit handovers before occupancy.

02

Renovations & Remodels

Detailed cleanup after home or commercial renovation projects of any scope.

03

Commercial Fit-Outs

Move-in-ready cleaning for new commercial spaces and office fit-outs.

04

Tenant Improvements

Final cleaning between tenants or after build-out for new leaseholders.

Flexible Scheduling

Pick a cadence. We handle the rest.

A newly built commercial kitchen mid-fit-out with cabinetry and electrical wiring spools

Every business runs differently. We schedule around your hours, your traffic, and how often you actually need us — same standard whether we’re in daily or once a quarter.

Final Clean

Move-in-ready clean before handover.

Rough Clean

Debris and dust control between trades.

Touch-Up Clean

Final pass after the deficiency walkthrough.

Full Three-Phase Package

All three phases under one contract.

Our Cleaning Process

How our post-construction cleaning works.

A four-step process built around your project timeline — from initial scope review through final inspection-ready detailing.

Get a Free Quote
Step — 01

Assessment & Pre-Plan

We review your project scope, timelines, and specific cleaning requirements.

Step — 02

Debris & Dust Removal

Heavy debris, construction dust, and surface residues are cleared from all areas.

Step — 03

Detailed Cleaning

Surfaces, fixtures, floors, and windows receive thorough detailing.

Step — 04

Final Touches

We inspect, polish, and ensure the space is move-in ready and spotless.

Trusted by Local Offices

In their own words.

Real feedback from the offices and buildings we clean every week across Hamilton and the Golden Horseshoe.

Done with care and so much attention to detail.
Jessica B.
They got even the old stains out.
Kim U.
Exceptional service and team. Would never look elsewhere.
Mo E.
They take the time to understand exactly what you are looking for.
Hali F.
Your customer service surpassed our expectations.
D. El-hag
You can trust them to get the job done right every time.
Adnan A.
Where we serve

Find your city.

We run post-construction cleaning across Hamilton, Burlington, Oakville, and Mississauga. Pick yours for the local crew, neighbourhoods, and FAQs.

Hamilton

Routes through downtown Hamilton, Ancaster, Stoney Creek, Dundas, and Glanbrook.

Burlington

Routes through Millcroft, Orchard, Tyandaga, and Brant Hills.

Oakville

Routes through Glen Abbey, Old Oakville, Bronte, and River Oaks.

Mississauga

Routes through Cooksville, Erin Mills, Meadowvale, and Streetsville.

Common Questions

FREQUENTLY ASKED QUESTIONS.

The questions we hear most about post-construction. Don’t see yours? Call (833) 356-7373 and we’ll cover anything else.

A rough clean runs during construction — debris out, floors swept, surfaces cleared so trades can keep working. The final clean comes at substantial completion: HEPA extraction of drywall dust from every surface, window and frame detailing, sticker and protective-film removal, adhesive and paint-spot removal, floors finished to move-in standard. The touch-up runs 24–48 hours before handover and catches dust that resettles plus anything the deficiency walkthrough flags. Most projects book final plus touch-up; larger builds add rough cleans between trades.
Drywall dust is fine enough to hang in the air for hours and pass straight through a standard vacuum bag. We run HEPA-filtered vacuums that capture particles down to 0.3 microns and work top-down — ceilings, vents, and ledges before walls and floors — so nothing gets cleaned twice. Even then, airborne dust keeps settling for a day or two after the final clean. That's exactly why the touch-up phase exists: it's part of the process, not a sign the first pass failed.
Yes — with the method matched to the surface. Stickers and protective film come off glass and appliances with plastic scrapers and adhesive remover. Dried latex paint spots lift with warm water and a plastic blade. Razor scraping is fine on standard annealed glass but can scratch tempered panes, so we test a corner first. Grout haze comes off new tile with a dedicated haze remover — never acid near natural stone. Anything that can't come off safely gets flagged to the GC instead of forced.
Yes — most of our post-construction work happens while painters, electricians, and flooring crews are still finishing. We carry $10M Commercial General Liability, our staff are bonded, and WSIB clearance certificates go to your site super before we mobilize. Crews wear site-required PPE, complete your orientation where the GC asks for it, and clean zone-by-zone behind the trades so finished rooms stay finished instead of being re-dusted the next morning.
Construction schedules slip — we plan for it. Tell us the moment an inspection or possession date moves and we re-slot the crew; you can reach us 24/7 and a real person reads every message, so a Friday-afternoon change doesn't sit in a queue until Monday. For hard deadlines like a certificate-of-occupancy inspection, we schedule the touch-up pass 24–48 hours ahead of the date, which leaves room for deficiency-list fixes without blowing the handover.
From a site walkthrough or a set of drawings. We price on square footage, how heavy the drywall dust is, glass count — window and frame detailing is often the largest single share of final-clean labour — floor types and their finish stage, how many levels, and whether the elevator is commissioned. We also confirm which phases you need: rough, final, touch-up, or all three. You get a fixed written quote the next business day.
Where We Work

Where we offer post-construction.

Find your area.

We’ll tell you whether we’re already on the ground there — Hamilton, the Golden Horseshoe, or a special project beyond.

Type a city or neighborhood to get started.